Turnkey Plant Solution

Build Your EPS Raw Material Plant — Get Running Fast

From plant layout, equipment selection, installation guidance to production startup.

We provide the Equipment + the Design + the Layout — one vendor, one accountability chain, one fast path to production.

8-12 months
Contract → First Batch
5K-30K t/yr
Plant Capacity Range
3-in-1
Equipment + Design + Layout
8 sections
Full Plant Coverage

One-Stop EPS Raw Material Plant Setup

What We Provide

Not just machines — the full package: planning, equipment, installation, and ongoing support. One vendor for the whole plant.

1

Plant Planning + Layout Design

Full plant blueprint sized to your land + capacity + budget. We deliver engineering drawings ready for civil works.

2

EPS Production Equipment Supply

All 8 production sections supplied as one package — from reactor to bagger. One vendor, one accountability chain.

3

Installation + Commissioning Guidance

On-site engineers walk your team through mechanical install, piping, electrical, and first production batch.

4

Training + After-Sales Support

Operator training during commissioning + long-term technical support for recipe adjustment + equipment upgrades.

Who Is This Solution For?

We Serve 4 Buyer Profiles

New Investors

Entering EPS raw material industry for the first time. We help you size capacity + select grades + build the plant.

Existing EPS Molders

Already producing fish boxes / insulation / packaging and want to produce own raw beads to cut material cost.

EPS Packaging Factories

Fish box / fruit box / cooler box / panel makers wanting upstream raw material control + supply stability.

Capacity Expanders

Existing raw material plants wanting to expand capacity or upgrade to higher automation level.

Main Sections of an EPS Raw Material Plant

8 Production Sections We Engineer

Every section sized + integrated for stable bead production. We engineer all 8 — no missing links between vendors.

01

Raw Material Storage

Styrene + additive tank farm. Compliant with chemical storage regulations. Receiving + transfer stations.

02

Polymerization System

Suspension polymerization reactors. Pentane blowing-agent infusion. Controlled temperature + pressure.

03

Washing & Dewatering

Remove residual suspending agents + unreacted styrene. Centrifugal dewatering before drying.

04

Drying System

Fluidized bed dryer with hot air circulation. Moisture < 0.5% for downstream stability.

05

Screening System

Multi-deck vibratory screens. Sort beads by grade (301 / 302 / 303 / 401 / 501).

06

Coating System

Anti-static + mold-release coating applied per end-product recipe. Uniform layer for stable re-foam.

07

Aging & Storage

Multi-silo aging stabilizes beads 24-72 hours. PLC routes grades + densities separately.

08

Packing System

Automatic 25kg bag + 1000kg jumbo bag with weighing + tag printing + pallet wrap.

Production Process

EPS Raw Material Production Process

From styrene tank to packed bead — 9 stages, fully integrated.

Stage 1
Styrene & Additives
Stage 2
Polymerization
Stage 3
Washing
Stage 4
Dewatering
Stage 5
Drying
Stage 6
Screening
Stage 7
Coating
Stage 8
Aging & Storage
Stage 9
Packing

How We Support Your Project

From First Call to First Bead — 6 Steps

We drive the timeline. Our engineers stay engaged from proposal through commissioning so you get to production quickly.

1

Discover

Understand your capacity target, product grades, and local utility conditions.

2

Propose

Deliver preliminary plant layout + equipment proposal + budget estimate.

3

Confirm

Finalize technical configuration + commercial terms + delivery schedule.

4

Manufacture & Deliver

In-house equipment build (4-6 months) + sea freight + on-site delivery.

5

Install & Commission

On-site engineers guide installation, piping, electrical, and first production batch.

6

Train & Support

Operator training during startup + long-term recipe + technical support.

Customized According to Your Factory

No Template Plant — Built Around You

Every variable is yours to set. We engineer the plant around your specific situation, not a copy-paste blueprint.

1 Plant Size + Footprint

How We Do It

We start from your land shape (rectangular / irregular), height limits, and adjacent buildings. Typical plant 1,500-5,000 m² — but we draw layouts even for narrow / multi-floor sites. Civil drawings delivered before equipment manufacture.

Contact Us About This Or call +86 13656166310
2 Production Capacity (5K-30K t/year)

How We Do It

Sized to your market demand: 5K-10K t/year for regional supply, 15K-20K t/year for export-oriented, 25K-30K+ for national-scale. We help new investors size capacity based on regional EPS molding demand survey.

Contact Us About This Or call +86 13656166310
3 Automation Level

How We Do It

From semi-auto (manual interventions at silo + packing) to full SCADA + recipe library + remote monitoring. New investors: we recommend mid-automation Phase 1 → upgrade to full-auto Phase 2 once production stabilizes.

Contact Us About This Or call +86 13656166310
4 Storage System (silo / drum / tank)

How We Do It

Multi-silo for finished beads sorted by grade, drum storage for additives + initiators, tank farm for styrene monomer. Sized to your inventory turnover. Compliance with local chemical storage regulations included.

Contact Us About This Or call +86 13656166310
5 Packing Method (25kg / jumbo bag)

How We Do It

Standard 25kg PP-woven bag (retail-friendly, China/SE Asia common) or 1000kg jumbo bag (export, EU/US common). Dual-output line possible — switch by recipe. Auto-bagger + weighing + tag printing + pallet wrap included.

Contact Us About This Or call +86 13656166310
6 Local Utility Conditions

How We Do It

We audit your electrical (3-phase 380V/400V/440V), steam boiler capacity, water quality + cooling tower availability, compressed air, and chemical storage compliance. Equipment specs adjusted to your local utility profile.

Contact Us About This Or call +86 13656166310
7 Budget + Investment Phasing

How We Do It

Full one-time investment OR Phase 1 (core + small capacity) + Phase 2 (expansion + automation upgrade). Cashflow analysis + ROI projection per phase. We help match equipment selection to budget without compromising critical sections.

Contact Us About This Or call +86 13656166310

Why Choose ChinaEps

6 Reasons We Get Your Plant Running

Get Running Fast

Our focus is helping you start production quickly. First bead batch typically 8-12 months from contract — we drive the timeline.

Equipment + Design + Layout in One Package

Not just machines — full plant engineering. Layout, P&ID, utility sizing, equipment selection all from one source.

Turnkey Project Experience

Walked multiple new investors + existing factories through complete plant build from concept to startup.

Customized Per Your Factory

No template plant — every layout and capacity sized to your land, budget, market, and product mix.

On-Site Engineer Support

Our engineers fly to your site during commissioning. We help your team get the first bead out the door.

Long-Term Service Partnership

Recipe adjustments, troubleshooting, equipment upgrades as your capacity grows over years.

Ready to Build Your EPS Raw Material Plant?

Send us your required capacity, factory size, and target product grade. Our engineers will prepare a preliminary plant proposal — typically within 5-7 working days.

Request EPS Plant Proposal

Or call our project team: +86 13656166310 (Michael Zhu, Project Director)